Blog

  • Moshupa A10 Bridge Remains Closed Until 2027

    Moshupa A10 Bridge Remains Closed Until 2027

    Moshupa A10 Bridge, a vital transport link in southern Botswana, will remain closed for an additional 16 to 20 months, with completion scheduled between March and July, 2027. 

    The bridge has been closed for more than a year due to structural failure, forcing motorists onto lengthy detours that have severely disrupted local trade, travel and public transport operations. 

    In an interview, acting chief public relations officer at the Ministry of Transport and Infrastructure, Mr Moemedi Matsoga, explained that reconstruction of the bridge’s embankment retaining walls was halted in November 2024 after contractors encountered a high underground water table. 

    Mr Matsoga said the original plan to restore the embankment to its previous condition carried a high risk of future failure. Consequently, he said the existing contract was terminated in November 2024 to allow for a complete redesign and a new tender process. 

    He added that a tender for consultancy services, which detailed investigations, design and construction supervision, was initially advertised, with consultants shortlisted on October 8, 2025 and the tender scheduled to close on October 22, 2025. 

    However, he said the process was cancelled due to procedural errors. He said a new selective tender was approved on October 21, 2025 and revised documents were resubmitted for vetting on October 27, 2025. 

    He further said the ministry was currently awaiting confirmation of the new tender timetable, including site visits and submission deadlines. 

    Once appointed, Mr Matsoga said consultants would begin detailed investigations and remedial design work, where the project would proceed in two phases, including a three-month design phase followed by a 13-month construction phase, depending on the final design recommendations. 

    Mr Matsoga emphasised that apart from the earlier tender cancellation, there were no major constraints at present. He said tender documents for the design phase were undergoing final vetting and would soon be issued to shortlisted bidders. 

    In the meantime, he said motorists were advised to continue using alternative routes, including the Mogobane-Ranaka Road or through Moshupa village. 

    Meanwhile, the prolonged delay has sparked widespread frustration among residents and businesses in the Southern District, who have urged the ministry to explore temporary bypass solutions. 

    The ministry has assured the public that no shortcuts would be taken, stressing that a durable, long-term solution was the priority. 

    Bus Operators Association chairperson, Mr Tirafalo Mponang, expressed disappointment at the latest extension, saying the new mid-2027 target had placed members in an impossible position. 

    Mr Mponang said local operators in Moshupa had already lost substantial revenue because long-distance buses, now diverted through the village, were picking up passengers who would normally use their services. 

    “We had been patiently waiting for the bridge to reopen. This latest postponement has left us at a crossroads once again,” he said. 

    On other issues, Moshupa council chairperson, Mr Peter Sethibe, announced that the internal village bridge, which collapsed earlier this year, would soon be reconstructed. 

    Mr Sethibe said the council had secured funds from the road levy fund for the project and, given the approaching rainy season, had awarded the tender through an emergency procurement process. 

    He confirmed that with the reconstruction work at tendering stage, the bridge was expected to start soon. 

  • Child-Friendly Environment Key to Healing Process

    Child-Friendly Environment Key to Healing Process

    Sekgoma Memorial Hospital Advisory Committee in Serowe has refurbished children’s playground to expedite healing and recovery.

    Speaking during a handover ceremony of the facility to Sekgoma Memorial Hospital recently, Chief Registered Nurse Ms Mmabotswana Ramotlhala said the aim was to provide joy and comfort for hospitalised children, which were considered essential in the healing process.

    She said the importance of allowing hospitalised children to experience play and fresh air outside the limits of hospital walls could not be overemphasised.

    She observed that the bright colours and the chance to play outdoors provided patients with comfort and happiness, essential for their psychological and physical recovery.

    “Kids often feel homesick, and being restricted to hospital walls intensifies the anxiety that they already experience. The playground acts as a re-charge area; patients will certainly value the time they spend there, where happiness and laughter are sure to be found during their hospital stay,” she said.

    Chairperson of the Hospital Advisory Committee from Basimane boo Rra Boiditswe,Kgosi Kgalemo Nthutang,  commended the contributions of everyone engaged in the project, highlighting that the playground was renovated primarily due to its previous condition, which prevented patients from using it.

    “We recognised the playground as an area of focus, as its lack of use resulted in hospitalised children being confined to the children’s ward, where the concrete walls continually reminded them of their distance from home comforts, which can be depressing for young minds,” said Kgosi Nthutang.

    Kgosi Nthutang said they had engaged multiple stakeholders, including hospital staff, the community, and the private sector to offer support, leading to a playground that young patients would appreciate.

    He also pointed out that the project aimed to remind the community to support the government, mentioning that certain initiatives do not require significant funding and could be accomplished through cooperation between the government and its citizens.

  • District to Spend Over P21.3M for Internal Roads Projects

    District to Spend Over P21.3M for Internal Roads Projects

    Moshupa District Council has been allocated P21, 330 000 from the Road Levy Fund to complete critical internal roads projects and procure essential plant equipment.

    The announcement was made by council chairperson, Mr Peter Sethibe, on Tuesday during the opening of the council meeting running from December 9 to 16.

    Mr Sethibe informed the meeting that tenders for emergency works on Madutlela Road and repairs to a damaged section of Maseetsele Road in Moshupa closed on December 5, 2025, and were currently under evaluation. He emphasised that completing Madutlela Road was particularly urgent as it would restore access for residents and revive businesses severely affected by the road’s deterioration.

    He added that the tender for culvert construction and road maintenance in Lekgolobotlo closed on December 4 and was also under evaluation. A tender for a culvert along Emang Junior School in Ntlhantlhe Village has been re-advertised and would close on December 18.

    Other upcoming tenders include the supply and installation of solar streetlights in Moshupa, closing December 12, 2025 and the procurement of an excavator, closing December 19, both aimed at strengthening the council’s maintenance capacity and advancing renewable energy objectives, he said.

    Construction of storm water drains and paving works in Mogonye is already underway, with physical progress at 15 percent.

    Mr Sethibe described the P21.3 million allocation as a sacred trust from the community and pledged rigorous oversight to ensure value for money and durable infrastructure.

    In Machana, he said four staff houses were under construction to replace the tents currently used to accommodate teachers. The project was being delivered through a public-private partnership with companies contracted by Debswana Mining Company under its Corporate Social Responsibility programme. Mr Sethibe expressed profound gratitude to Debswana for the initiative.

    The Chairperson highlighted continued success under the Bonno Housing Scheme, noting that the first house built under the programme in the district was handed over to a beneficiary in Pitseng in November 2025.

    Construction of additional units has now begun in Mogonye following a warm welcome by village leadership to the scheme’s investors.

    “From providing decent accommodation for our teachers to enabling home ownership for our citizens, we are building the foundations for a more stable and prosperous district,” Mr Sethibe said.

    He concluded that the combined efforts in roads, renewable energy, housing, and community infrastructure demonstrate a council that is actively delivering sustainable development on multiple fronts.

    Councillor Omphemetse Moleele of Sesung-Seherelela Ward commended the Chairperson’s comprehensive report on ongoing and planned projects. 

    However, he urged the council to prioritise support for community clusters rather than individual businesses, citing the example of the Motlopi Coffee project.

    Cllr Moleele highlighted the untapped potential of salt pans and water pans in his ward, which he believes could be developed into large-scale salt processing and tourism attractions to boost the district economy. 

  • Council and BHC Handover Bonno House

    Council and BHC Handover Bonno House

    Bonno Housing Programme is on track in realising its mandate of providing affordable and dignified housing to citizens. 

    Recently, Francistown City Council handed the first turnkey house at Gerald Estate  in Francistown West constituency. Speaking at the event Francistown Deputy Mayor, Uyapo Nyeku expressed gratitude towards all the stakeholders who were part of the completion of the first Bonno house in the city.

    Mr Nyeku said the government housing scheme brings dignity to the people, further congratulating the beneficiary, Ms Thokozani Tafa for being the first in the constituency to receive the Bonno house.

    BHC Project Quality Assurance Officer, Ms Lebogang Gaebolae said the project was delivered well within the stipulated time. She said construction began in August 2025 and completed in November 2025 which was within the four months of the project time frame.

    Ms Gaebolae said the cost of the house, a turnkey Type A, was around P234,000 and the beneficiary would pay P90,000. She said they worked well with other stakeholders to ensure the project ran smoothly and was completed on time.

    For her part, the beneficiary, Ms Tafa appreciated government for the Bonno Housing scheme which she said was important for providing affordable and dignified accommodation. 

  • Ministry Unveils 10 Bonno Project Investors in Kgatleng

    Ministry Unveils 10 Bonno Project Investors in Kgatleng

    Ministry of Water and Human Settlement on Friday unveiled 10 investors who will partner with government for the Bonno National Housing programme in Kgatleng District.

    The programme is aimed at providing accessible and affordable housing for citizens across various income brackets.

    Unveiling the investors in Mochudi recently, Assistant Minister of Water and Human Settlement, Mr Motsamai Motsamai said government, through the national transformation agenda, prioritised private sector led investments.

    He said such partnerships contributed to economic growth and well-being of the society. Conversely, he also said the initiative would further empower artisans by improving their skills in construction.

    He commended investors for their trust and commitment to the vision, adding that building 100 000 housing units was such an ambitious initiative that needed the support of all.

    Furthermore, Mr Motsamai commended Kgatleng District for responding swiftly to the programme by availing land and further implored district authorities to support the investors.

    He said the housing units would provide decent and affordable housing for low income residents, adding that owning a home restored one’s dignity and offered some form of security especially for people who had always longed to own decent homes.

    Meanwhile, Kgatleng Land Board acting deputy secretary, Mr Neo Rakodu said the 10 investors would construct housing units in all the three constituencies of Kgatleng Central, Kgatleng West and Kgatleng East covering 73 hectares of land for constructing a total of 1 162 plots.

    He said Kgatleng District was ready for such developments and that the district had set up a team that would facilitate the investors.

    Mr Rakodu said there were some negligible challenges in some parts of the district, but noted that overall, the programme was progressing well, with some plans approved, while some would be approved by November 20.

    Bakgatla Deputy Chief Kgosi Bana Sekai commended government for ensuring that Kgatleng was not left out while specially elected councillor, Ms Kentse Mollentze said Bakgatla were ready for the housing units that would give the district a facelift.

    She assured the investors of unwavering support from the district authorities and that they would ensure that hired artisans provided good workmanship. 

  • Remains of Crocodile Attack Confirmed

    Remains of Crocodile Attack Confirmed

    Police have confirmed that the human remains recovered along the Thamalakane River belong to the 12-year-old boy who was attacked and dragged into the water by a crocodile last week.

    Maun Police Station Commander Superintendent Joseph Lepodise said the bones found on Saturday during the search operation were sent for DNA testing and a post-mortem on Monday. The results, he said conclusively matched the missing child.

    The remains were discovered by search teams and were immediately secured for forensic examination to determine whether they belonged to the boy who disappeared during the crocodile attack.

    According to initial reports, the child had been at the river with peers when a crocodile suddenly emerged, seized him and disappeared into the water before anyone could intervene.

    Over the past several days, officers from the Botswana Police Service, the Department of Wildlife and National Parks and Botswana Defense Force conducted a coordinated search along the Thamalakane River in hopes of finding the boy or evidence pointing to his fate.

    The community has been urged to exercise heightened caution around rivers and water bodies known to harbor crocodiles, especially during periods when the reptiles are active and human activity along the riverbanks increases.

  • New CEDA Branch to Spur Local Growth

    New CEDA Branch to Spur Local Growth

    The establishment of a Citizen Entrepreneurial Development Agency (CEDA) branch in Tutume has been warmly welcomed by clients and the broader business community, as it brings renewed hope and opportunities especially for young people who previously struggled to access services offered in Francistown.

    Tutume and its surrounding villages have long been home to hardworking, innovative and ambitious people across sectors such as agriculture, retail and tourism. With the region’s vast economic potential, the opening of the new CEDA office is viewed as a major boost for both Tutume and parts of the North East District. The Nswazwi–Kalakamati bypass road is expected to reduce travel distances for residents seeking CEDA services, eliminating the need to travel to Francistown for essential support.

    Speaking during the official opening, Minister of Trade and Entrepreneurship, Mr Tiroeaone Ntsima, said CEDA believed in people’s ideas and was committed to nurturing them into viable businesses. Doing so, he said, would create employment opportunities and strengthen local economic empowerment , key priorities under government’s job-creation agenda.

    Mr Ntsima highlighted that since its establishment in 2001, CEDA had remained one of the country’s strongest instruments for citizen economic empowerment, funding thousands of citizen-owned businesses, supporting start-ups, reviving struggling enterprises and creating opportunities for youth and women nationwide.

    In the region alone, he revealed that the agency had invested over P150 million in 943 businesses across various sectors, a clear demonstration of its commitment to entrepreneurship and economic development.

    He further noted that the opening of the new branch marked a significant milestone in CEDA’s growth, aligning with government’s broader economic diversification drive under the Botswana Economic Transformation Programme (BETP), which aimed to reduce reliance on diamonds.

    CEDA beneficiary and businessma, Mr Power Monyamane welcomed the development, describing the new office as a breakthrough that would close long-standing gaps caused by limited access to information and services due to distance. He encouraged fellow entrepreneurs to visit the office for accurate, first-hand information rather than relying on hearsay, noting that some aspiring businesspeople hesitated to seek guidance directly.

    He advised that passion was key to business success, cautioning against copying others’ projects without genuine interest. Mr Monyamane, who has invested in property development through CEDA support, said he had built office spaces currently housing the Ministry of Finance revenue office. He indicated plans to seek further funding for upcoming projects.

    He urged young people to take advantage of the new CEDA office, apply for funding while they were still young, and use the opportunity to build sustainable businesses and long-term careers. 

  • Arts Expo Signals Festival Rebirth

    Arts Expo Signals Festival Rebirth

    Maun, recently, witnessed the birth of a refreshed cultural celebration at Cresta Riley’s Hotel: the Poetavango Music and Arts Expo. The event is a spirited spin-off of the long-running Maun International Arts Festival (MIAF), which has served as a cultural anchor for the region for years.

    For Poetavango chairperson,  Legodile Seganabeng, the day was more than just another event; it marked a quiet revival of an artistic tradition that had been on the brink of fading.

    “Last year we did not have the main festival because of financial challenges,” he said, explaining how a once well-funded cultural pillar found itself struggling to stay afloat without consistent government support.

    Determined to preserve the festival, Poetavango turned to partnerships, finding critical support from the Orange Botswana Foundation. The collaboration made this year’s music-focused edition possible.

    Orange Botswana Foundation Social Impact Coordinator, Dineo Mpule, said the partnership aligned with the organisation’s mission to uplift cultural and artistic initiatives.

    “We are proud to be the main sponsor of the Music and Arts Expo happening today,” she said. She noted that Orange Botswana contributed P150,000 to the festival, adding that the foundation supported projects that advance culture and expand access for communities.

    “Culture brings together a wide range of audiences across all social groups, establishing dialogue between countries and communities which is why it is important to support such initiatives,” she added.

    According to  Mpule, supporting Poetavango was not merely an act of charity but an investment in creative potential, particularly in bold and innovative projects that nurtured young artists, musicians, and authors who would shape the future economy.

    Poetavango has long been synonymous with poetry, powerful verses that fill rooms and captivate audiences. However,  Seganabeng acknowledged that this strong identity had unintended consequences, as other art forms such as comedy, visual arts, and music often remained overshadowed.

    “Poetry became so big that people never fully saw our capacity in music,” he said.

    The Music and Arts Expo was crafted to shift that narrative. For the first time, music claimed centre stage, providing young performers with opportunities they had long awaited, while showcasing the breadth of Poetavango’s artistic reach.

    “We needed something that would turn the corner so that when we bring music back to the main festival, people will know what we are talking about,” he explained.

    One of the most distinctive features of the event was its intentional inclusion of children, an often overlooked demographic in arts festival planning. Face painting, water slides, swings, and a lively play area transformed the venue into a family-friendly space, ensuring that entertainment extended to the youngest festival-goers.

    “People forget about children, yet they also need entertainment, and it is important that they also explore and experience fun,” said Seganabeng.

    The expo also sought to uplift music in a region where the art form continues to struggle for visibility and where opportunities for young musicians remain limited. Poetavango hopes this renewed focus will help shift that dynamic.

    Judging by the enthusiasm of the crowd, the organisation had succeeded. Families lingered long after performances ended, musicians mingled with supporters, and a renewed sense of cultural pride rippled through the venue. 

  • Book Tackles Hidden Traumas

    Book Tackles Hidden Traumas

    Behind every woman who appears unshaken, there is often a story she has never told.

    In her new book Unspoken Realities, author Jean Nkuru opens a window into the hidden experiences of women living with gender-based violence, along with a way out to freedom.

    The faith-based guide, rooted in personal experience and spiritual reflection, draws inspiration from the unwavering faith of Nkuru’s mother, who silently endured her own share of life’s challenges, including domestic violence. Despite the hardships, she emerged resilient, strengthened by her deep trust in God.

    For Nkuru, the book stands as a powerful reminder of faith’s ability to sustain, uplift and ultimately set one free, spiritually and physically.

    “With the heavy weight of my mother’s struggles, there were moments I expected her to stumble. But somehow, she always emerged stronger. Later, I understood it was because she held firmly to her faith in God to see her through,” Nkuru said in an interview.

    Though Unspoken Realities is written for a broad audience, the 126-page book speaks especially to mothers and women, those who often share only fragments of their struggles while keeping the rest hidden, hence the title Unspoken.

    Chapters such as A Deceiving Mother explore the polished façades many women maintain while suffering quietly in relationships in an effort to protect their children. 

    The chapter urges mothers to rise from deception to authenticity and to seek healthier and balanced ways to safeguard their children while preserving their own well-being.

    Other chapters, like Warfare Mother, emphasise the importance of prayer and spiritual warfare, reflecting Nkuru’s belief that many of life’s troubles extend beyond what the eye can see, influenced by unseen forces that can only be challenged through prayer.

    In total, the book features 27 chapters, each crafted to speak to women across the many areas where they may need support.

    At its core, Unspoken Realities encourages women to draw strength from faith, not to endure silently, but to speak out for their own healing and to protect the well-being of their children. 

  • Mompe Elevates to International Cycling Body

    Mompe Elevates to International Cycling Body

    Game Mompe is pedalling her way to the pinnacle of international cycling governance.

    This follows an announcement that the Union Cycliste Internationale (UCI) has officially appointed her as a member of the UCI BMX Freestyle Commission for the prestigious 2025–2029 term, a move that significantly elevates her growing influence within the global cycling community.The appointment, confirmed via a press release from the Botswana Cycling Association (BCA), places Mompe within the specialist bodies established by the UCI Management Committee.These bodies are crucial to the UCI’s mission and governed and advanced cycling worldwide by developing strategic and regulatory recommendations that shaped the evolution of their respective disciplines.Mompe is now part of an elite, diverse group of experts and athlete representatives hailing from cycling powerhouses like Denmark, New Zealand, Germany and Japan.Her presence marks a significant moment, ensuring a fresh, African perspective is brought to the table for the strategic development of BMX Freestyle on the global stage.UCI president, David Lappartient, confirmed Mompe’s appointment, expressing strong confidence in her future contributions. He anticipates that her input will be positive and constructive for the continued development of cycling worldwide.Mompe’s UCI role is the crowning achievement in what has been a truly remarkable year of success in sport governance. Her appointment is the culmination of a series of achievements that have rapidly accelerated her trajectory, including her election as Botswana National Olympic Committee (BNOC) vice president earlier this year.She has also made history by becoming the first Motswana to be appointed to the Confederation of African Cycling (CAC), establishing a significant milestone for Botswana’s presence and voice within continental sport governance.For the Botswana Cycling Association (BCA), Mompe’s appointment holds immense national significance as the association anticipates that her new role will deliver several key benefits to the country as well increase Botswana’s exposure to the BMX discipline, which is a fast-growing Olympic sport.The role further provides direct access to international expertise and development pathways and this comes at a crucial time, as the BCA is currently undergoing internal discussions regarding the introduction of BMX in Botswana.Leveraging Mompe’s new international platform, the BCA aims to create new opportunities for youth participation, talent identification and the diversification of the nation’s cycling portfolio.